Revert "resolve second_ conflict which breaks xlf timef"
This reverts commit 9b24b31419.
It turns out that PRs 4515 and 4520 break the tests under
lapack-netlib/TESTING which require SECOND and DSECND. IBM
has decided this is a bigger biger problem than the conflict
between lapack second_ and the xlf run time.